Tuesday, June 14, 2011

Wind / Solar Hybrid projects

 




Dear  Project Director,
We feel honoured to introduce our selves as the pioneers in this trade in Pakistan we have been practically in this trade for over 15 years. We have completed so far over 200 projects of wind turbines, Wind / Solar Hybrid projects for rural and urban electrification and water pumping especially for agriculture Purpose. We also deal in micro hydro power, Bio diesel and Bio Gas.

 

Alternate energy is ideal for telecom towers, resorts, farm houses in remote areas. The life of such projects is designed to last for over 20-25 years from Q-cells Germany / Shireen Inc USA. Alternate Energy is our future and luckily the coastal areas in Sindh and some other areas in Pakistan have sufficient wind and can be helpful in production of energy with the assistance of Solar Power, grid or diesel engine. We are working on Telecom projects to convert the site on Solar PV. More than 100 sites have been completed to run with 10 KW solar system each 30 sites of other telecom company are in progress for Wind / Solar Hybrid in Tharparkar Areas. We have in hand projects for rural electrification from NGOs for 150 villages in K.T.Bandar which will be completed by June 2011 where as 53 villages have been electrified. The DHA city site office and IDSP institute Quetta has been electrified with Wind Solar Hybrid System. We offer the customise lighting/ water pumping for cattle/ poultry farms and aeration technology for fish farms.

 

Advantages of Alternate energy.


1- Environmental Friendly System

2- Free water pumping for agriculture and drinking.

3- Non Billing system or light failure

4- Ideal for domestic, farm houses and remote areas.

5- Zero emissions of air pollutants and greenhouse gases

6- Virtually no energy costs once installed

7- Sunlight and wind is widely available.

8- Though tall, wind turbines only require a small plot of land.

9- The cost per watt is among the lowest of current energy options.

10-Their ideal locations tend to be on farms and ranches, which is

     beneficial to rural economies.

11-No load shedding can be hybrid with grid / solar/ Diesel or Biogas.

12-Alternate energy is not costly, only need proper calculations.

13-The pay back for wind solar hybrid is 3-5 years depending on wind /solar availability.

14-Solar Street lights, don't need cabling work etc.

Yours Truly

M.Sarwar( Director Technical).
 
MESEC
M-3 & 4, Akbar Paradise, Gulshan-e-Iqbal
Block-10, Opposite Aladin Park,
Karachi 75300 Pakistan.
PH # +92-2134837609, 34971610, 34971642
FAX # 34971813
Mobile: 0321-2919959
E-Mail, mesec@cyber.net.pk
 
 
 
 



https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgz5VHvxh-4wR6JF6nF_OhEvl6HEEOds7nCJmCzPx3Y6_SPE6Hw9JLdCw3Oxs7ctjIL8nVHBHK2Ixa8G-XY0YafSUdlW6L6hYYxLbyAHKEKJIJiJ2M7o4SDRQ4h7Sul9Wg4BvOT_G8TbH0/s1600/PANT-COATS.jpg







 

Email Marketing by Events Updates:

For queries & advertising email to: events.updates6@gmail.com

http://eventsupdates.blogspot.com

 

To advertise call or SMS cell # 0334-3056757

 

__._,_.___
Recent Activity:
.

__,_._,___

No comments:

Post a Comment